- Increase of pilgrim shed.
- East West Brick road corridor at Sagar Mela ground at beach.
- Toilets of Panchayet Samity to be covered by attendant.
- Increase of toilet blocks of Sulabh. This time number Sulabh latrine will be three hundred in place of one hundred in last year.
- PHE will Increase of improvised mobile toilet.
- Proper signage of toilet blocks will be done.
- Arrangement of urinal will be done.
- Arrangement of shed and platform for devotional cultural programme from 12th to 14th January, during 7:00 PM to 11”00 PM.
- Arrangement of additional low draft ship.
- Increase of space near LCT jetty at Lot No. 8.
- Arrangement of connecting road between bus stand no. 1 and 2 at Kachuberia.
- Mela Control office at Outram ghat will be made.
- It will be tried to make this Mela a Pollythine free, smoke and alcohol free Mela.
- Increase of changing room.
- Increase of ATM facility including at Lot No.8.
- Good food stall will be arranged for pilgrims by private enterprise.
- One bypass road at Kachuberia will be explored for better traffic management.
- Lightning arrangement and extension of bypass road from K2 bus stand towards Kalinagar at Sagar will be made.